|
Error 1 Overflow
|
|
•
|
A result is outside the calculator range (± 9.9999999999999E99). |
|
•
|
Tried to divide by zero (can occur internally). |
|
•
|
Tried to compute 1/x when x is zero. |
|
•
|
Statistics worksheet: a calculation included X or Y values that are all the same. |
|
|
Error 2 Invalid argument
|
|
•
|
Tried to compute x! when x is not an integer 0-69. |
|
•
|
Tried to compute LN of x when x is not > 0. |
|
•
|
Tried to compute yx when y < 0 and x is not an integer or the inverse of an integer. |
|
•
|
Tried to compute when x < 0. |
|
•
|
Amortization worksheet: tried to compute BAL, PRN, and INT when P2 < P1. |
|
•
|
Depreciation worksheet: a calculation included SAL > CST. |
|
|
Error 3 Too many pending operations
|
|
•
|
More than 15 active levels of parentheses were tried in a calculation. |
|
•
|
A calculation tried to use more than 8 pending operations. |
|
|
Error 4 Out of range
|
|
•
|
Amortization worksheet: the value entered for P1 or P2 is outside the range 1‑9,999. |
|
•
|
TVM worksheet: the P/Y or C/Y value 0. |
|
•
|
Cash Flow worksheet: the Fnn value is outside the range 0.5-9,999. |
|
•
|
Bond worksheet: the RV, CPN, or PRI value _0. |
|
•
|
Date worksheet: the computed date is outside the range January 1, 1980 through December 31, 2079. |
|
•
|
Depreciation worksheet: the value entered for: declining balance percent 0; LIF 0; YR _ 0; CST < 0; SAL < 0; or M01 1 M01 13. |
|
•
|
Interest Conversion worksheet: the C/Y value 0. |
|
•
|
The DEC value is outside the range 0‑9. |
|
|
Error 5 No solution exists
|
|
•
|
TVM worksheet: the calculator computed I/Y when FV, (N Q PMT), and PV all have the same sign. (Make sure cash inflows are positive and outflows are negative.) |
|
•
|
TVM, Cash Flow, and Bond worksheets: the LN (logarithm) input is not > 0 during calculations. |
|
•
|
Cash Flow worksheet: the calculator computed IRR without at least one sign change in the cash-flow list. |
|
|
Error 6 Invalid date
|
|
•
|
Bond and Date worksheets: a date is invalid (for example, January 32) or in the wrong format (for example, MM.DDYYYY instead of MM.DDYY. |
|
•
|
Bond worksheet: the calculator attempted a calculation with a redemption date earlier than or the same as the settlement date. |
|
|
Error 7 Iteration limit exceeded
|
|
•
|
TVM worksheet: the calculator computed I/Y for a very complex problem involving many iterations. |
|
•
|
Cash Flow worksheet: the calculator computed IRR for a complex problem with multiple sign changes. |
|
•
|
Bond worksheet: the calculator computed YLD for a very complex problem. |
|
|
Error 8 Canceled iterative calculation
|
|
•
|
TVM worksheet: $ was pressed to stop the evaluation of I/Y. |
|
•
|
Amortization worksheet: $ was pressed to stop the evaluation of BAL or INT. |
|
•
|
Cash Flow worksheet: $ was pressed to stop the evaluation of IRR. |
|
•
|
Bond worksheet: $ was pressed to stop the evaluation of YLD. |
|
•
|
Depreciation worksheet: $ was pressed to stop the evaluation of DEP or RDV. |
|